English

ROPEWAY ROPES
Full locked coil ropes, stranded ropes and telecom ropes. Link

MINING ROPES
Steel wire ropes for conveyor belts, shaft mines and bucket excavators. Link

STRUCTURAL ROPES
Steel wire ropes for facades, roofs, bridges and special applications. Link

WINCH ROPES
Steel wire ropes for snow groomers. Link

SERVICE
Splice work, rope inspection, rope cleaning and repairs. Link

 

The PERFORMA-DT from FATZER won over the 38-member jury of the Red Dot Award: Product Design 2015. With its high-performance stranded rope, FATZER proved its design excellence in the most important competition for product design, which is celebrating its 60th anniversary this year. The international experts discussed and assessed each of the 4,928 entries from …

Apr 27, 2015

The world’s first cable supported bridge connecting to mountain peaks. The Peak Walk Bridge is build as a suspension bridge. It is the first and only pedestrian bridge (footbridge) in the world that connects to mountain peaks. The bridge enables advantageous visitors a grand view across the Alps. The rope and cable assembly manufacturer FATZER …

Nov 21, 2014

Faster—cleaner—cheaper: With urban cableways, a means of transport which formerly was used primarily to make mountain regions accessible conquers the city. The new PERFORMA-DT stranded rope from FATZER was developed especially for this application. As a leading manufacturer of heavy-duty steel ropes and a leader in innovation, FATZER was already offering a suitable solution for …

Oct 23, 2014

Around the world, drivers of Kässbohrer snowcats rely on PWtrac® winch ropes from original equipment manufacturer Fatzer. And with good reason: They are the safest, most reliable ropes used for the difficult work on steep slopes and are distinguished not only by their reliability and long service life, but also by particularly high breaking forces. …

Jul 13, 2014

In October 2007 when FIFA gave the nod to Brazil to host soccer’s 2014 World Cup, Rio, among the 12 cities where World Cup matches would be held, appeared to be the certain location of the finals. With this in mind, Maracanã Stadium was refurbished to the tune of nearly 316 million euros. The new …

Jun 3, 2014

16.5 km of 34-mm mining ropes per bobbin: A total of 85,000 meters of FATZER stranded ropes was manufactured for a conveyor system in Australia. The six bobbins are first sent to the Rhine port in Basel and transported from there by ship to Rotterdam, where they are loaded onto a freighter bound for Australia. …

Mar 12, 2014